GJ3A Three-boom Three-basket Arch Installation Trolley
Source: Date:2021年10月25日

Anthem of CREC—“Trailbreaker”

5

  Independently developed by China Railway Engineering Equipment Group, the GJ3A three-boom three-basket arch installation trolley is a new type of equipment for tunnel construction. It can be used for arch installation, high-altitude auxiliary mesh affixing, bolt setting, and auxiliary charging, and also serves as a platform for aerial work. Powered by both diesel and electricity and capable of two-way driving, the equipment is designed to work under difficult engineering conditions and suitable for arch installation in single-hole single-lane tunnel, single-hole double-lane tunnel, and tunnels adopting the full-face method or the bench cut method. It can also help install steel arches and flower arches in different sizes. With three heavy-duty booms, the highly-efficient, multifunctional GJ3A arch installation trolley is easy to be maintained at lower labor costs.

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved