Anthem of CREC—“Trailbreaker”
Structure of Mekong River Major Bridge Closed
The 1458.9-meter-long Mekong River Major Bridge witnessed successful closure of structure recently, 7 months ahead of schedule. The Bridge, located at Luang Prabang, constructed by CREC subsidiary---China Railway No. 8 Engineering Group, is one of the most challenging and technically complicated parts of the whole line of Boten-Vientiane Railway. This process marks a great breakthrough of the Boten-Vientiane Railway Project.
Menga No. 2 Tunnel was Through
Menga No.2 Tunnel of Boten-Vientiane Railway was tunneled through by CREC subsidiary---China Railway Guangzhou Engineering Group, recently. CREC workers encountered very complicated geological challenges during the excavation of this 450-meter-long tunnel, while they overcome the hardships and successfully completed the excavation with safety and high quality.
Contact Us
Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China
Post Code: 100039E-mail: crecwebmaster@163.com
Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html
@ 1999-2019 CREC All Rights Reserved