Location: Home > News Update > News Update
Recent Achievements of Boten-Vientiane Railway Project
Source: Date:2019年08月21日

Anthem of CREC—“Trailbreaker”

Structure of Mekong River Major Bridge Closed

The 1458.9-meter-long Mekong River Major Bridge witnessed successful closure of structure recently, 7 months ahead of schedule. The Bridge, located at Luang Prabang, constructed by CREC subsidiary---China Railway No. 8 Engineering Group, is one of the most challenging and technically complicated parts of the whole line of Boten-Vientiane Railway. This process marks a great breakthrough of the Boten-Vientiane Railway Project.

Menga No. 2 Tunnel was Through

Menga No.2 Tunnel of Boten-Vientiane Railway was tunneled through by CREC subsidiary---China Railway Guangzhou Engineering Group, recently. CREC workers encountered very complicated geological challenges during the excavation of this 450-meter-long tunnel, while they overcome the hardships and successfully completed the excavation with safety and high quality.

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved