Location: Home > News Update > News Update
Continuous Beam Mid-span of the Longest Bridge on China-Laos Railway Completes Closure
Source: Date:2021年03月25日

Anthem of CREC—“Trailbreaker”

On March 11, the closure of the central section of the continuous beam of the longest bridge along the China-Laos Railway was completed, two days ahead of schedule. The project is undertaken by China Railway No.5 Engineering Group (CREC-5). 

the bridge

Located in Vientiane City in central Laos, the bridge has a total length of 7,528.56 meters, including 48 meters of continuous beam mid-span, and 231 piers. Construction of the bridge began on July 27, 2020, and to date, a total of 3,844.5 meters have been completed, accounting for 51.1 percent.  (By Xie Yongbin and Xu Haole)

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved