Location: Home > Core Business > Investment
Chengdu Metro Line 3 Project
Source:CREC Date:2018年11月27日

Anthem of CREC—“Trailbreaker”

Phase I Project of Chengdu Metro Line 3 is “Investment & Financing + EPC + Repurchase”, with a total length of the line approximately 20.359 kilometers, all of which is underground lines. It starts from southwest at Hongpailou South Station to the north-west at Tianhuizheng South Station connecting 17 stations and including one vehicle depot (the northern suburbs vehicle depot). With a contractual investment of 6.9 billion CNY (approximately 1 billion USD), the project started in May 2012 and opened for trial operation in June 2016.

Pouring Concrete to the Bottom Plate of Section 16 in Chengdu Metro Guangdu North Station

Chengdu Metro Line 3 Project

 

 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved