Qinhuangdao-Shenyang Passenger Dedicated Line
Source:International Business Division Date:2018年11月27日

Anthem of CREC—“Trailbreaker”

Qinhuangdao-Shenyang Passenger Dedicated Line is the first two-line electrified high-speed railway independently designed and constructed by Chinese enterprise. Started in 1999 and completed in 2002, it is approximately 404-kilometer-long. CREC independently built approximately 60% of the project which has won the Luban Award for Construction Project.

Laying Track of Qinhuangdao-Shenyang

 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved