YL900 Mobile Bridge Erection Machine
Source:CREC Date:2018年11月29日

Anthem of CREC—“Trailbreaker”

YJ900 Mobile Bridge Erection Machine is suitable for the erection of 20-meter-long, 24-meter-long and 32-meter-long double-line full-hole concrete box girder for passenger dedicated line in mountain areas. After the girder is loaded to precast yard by the machine, it will be transported to the erection position through the access road, roadbed, bridge and culvert.

YL900 Mobile Bridge Erection Machine

 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved