Location:Home > Sustainable Development > Technical Innovation  > Construction Methods
Construction Methods

CREC highly values the development and application of new technology, new craft, new material and new equipment. The Company continues to strengthen technology accumulation, enhance construction method development, and improve construction technique as well as management capability to accelerate the generation of fruitful results.


By the end of 2015, CREC holds 166 National Grade Normalized Construction Methods and 1,630 Provincial and Ministerial Grade Normalized Construction Methods. 

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved