Yingxiu Tunnel of Yingxiu-Wenchuan Highway Project
Source:CREC Date:2018年11月28日

Anthem of CREC—“Trailbreaker”

Yingxiu-Wenchuan Highway project is seven kilometers away from the epicenter of Wenchuan Earthquake occurred on May 12, 2008. Started in July 2009 and opened to traffic on November 23, 2012, the railway is 3.04-kilometer-long and Yingxiu Tunnel, core of the project, is 2.7-kilometer-long.

Yingxiu Tunnel of Yingxiu-Wenchuan Highway Project

During the construction process of Yingxiu Tunnel, engineers faced huge challenges and construction risks of 86,403 aftershocks. For the people in the disaster area, the traditional construction method was replaced by the zero-interval construction method, and the post-disaster reconstruction work was completed on schedule. The Water Supply Device for Tunnel won the National Practical Model Patent Certificate and Energy Conservation and Emission Reduction Creative Competition Award of Shanxi Province in 2011. The project was recorded in the “Pursuing Excellence and Achieving Glory” Sichuan Expressway Project Standard Construction and Fine Management Achievements Book in September 2012. 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved