Location: Home > Core Business > Overseas Business
Mohammed VI Bridge, Morocco
Source: Date:2018年11月30日

Anthem of CREC—“Trailbreaker”

It is the first cable-stayed bridge invested by Morocco. The bridge is 951.66m in length and the main bridge is three-span cable-stayed bridge including a 376m-long main span and two 183m-long side spans. The approach bridge is composed of five-span precast T-shape structure. The bridge was commenced in June 2010 and completed in April 2015.

Mohammed VI Bridge in Morocco

 

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved