The dynamic detection test of the first section of the Jitong Railway Electrification Reconstruction Project contracted by China Railway Electrification Engineering Group has been successfully completed, and the opening of the Jining to Haoluku section has entered the countdown. The total length of the Jitong Railway is 923 kilometers, and the whole length of the upcoming section is 433.685 kilometers. Jitong Railway is an east-west trunk line connecting Northeast, North, and Northwest China and also a critical energy transport channel in China. After the transformation, it is of great significance to speed up the development and utilization of coal and various mineral resources in Western Inner Mongolia and revitalize the economy of minority areas. The picture shows the inspection train passing through the Bawang River Bridge from Jining to Haoluku.