Location:Home > detail
Location: Home > News Update > News Update
The Main Substructure of the Niger River Bridge on the Maribaya?Port?to?Simandou?Railway is Completed
Source: Date:2024年06月07日

几内亚马西铁路尼日尔河特大桥线下主体工程完工1

On May 28, at the construction site of the Niger River Bridge on the Maribaya Port to Simandou Mining Area Railway in the Faranah region of Guinea, with the completion of the concrete pouring for Pier 12, all 41 piers of the Niger River Bridge on the Maribaya Port to Simandou Railway, constructed by China TIESIJU Civil Engineering Group, a subsidiary of CREC, were successfully completed.

几内亚马西铁路尼日尔河特大桥线下主体工程完工2

The Maribaya Port to Simandou Railway Niger River Bridge crosses the Niger River, the largest river in West Africa. It is a crucial bridge project to ensure the erection of bridges along the Maribaya Port to Simandou Railway Niger Railway in the direction of Simandou Mining Area. The bridge's total length is 1326.1 meters, with 41 piers designed.

Print Close