On June 13 local time, the 86.3-kilometer road project in Ethiopia, constructed by China Railway Seventh Group, successfully passed the preliminary handover inspection organized by the Ethiopian Roads Administration.
On the same day, an inspection team composed of representatives from relevant units organized by the Ethiopian Roads Administration conducted a thorough on-site inspection and document review, comprehensively assessing the overall completion status and construction quality of the project.
Based on the team’s comprehensive evaluation, it was unanimously concluded that all construction tasks had been completed in accordance with the design documents and contractual requirements. The project quality meets Ethiopia’s national and industry standards, qualifying it for preliminary handover acceptance.