Location: Home > News Update > News Update
Jakarta-Bandung High-speed Railway in Indonesia Sees First Heavy-grade Box Girder Erected
Source: Date:2021年05月17日

Anthem of CREC—“Trailbreaker”

The first heavy-grade box girder along the Jakarta-Bandung high-speed railway in Indonesia was finished on April 28. China Railway No.4 Engineering Group is part of the construction team.

Jakarta-Bandung High-speed Railway in Indonesia Sees First Heavy-grade Box Girder Erected

The box girder is located near the Bandung end. The erection gradient was 2.97 percent, and the altitude difference between the front and back fulcrums reaches 97 centimeters, complicating the construction and making it very risky.

The total length of the Jakarta-Bandung high-speed railway is 142.3 kilometers. When opening to traffic, the railway service will shorten travel time from Jakarta to Bandung from more than three hours to around 40 minutes.(By Li Jinpeng)   

Print Close

Contact Us

Address: China Railway Plaza, No.69 Fuxing Road, Haidian District, Beijing, P.R. China

Post Code: 100039E-mail: crecwebmaster@163.com

Fax: +86-010-51877688Web: http://www.crecg.com/english/1990/index.html

@ 1999-2019 CREC All Rights Reserved